Prototyping
The final step in the product build is the assembly of parts and hardware into a final component or subassembly. It has become more common for customers to require finished assemblies. To meet those requirements, Park has dedicated a section of the PATC facility to final assembly. Final Assembly capabilities include bonding, close tolerance/precision drilling, riveting, sealing and final inspection before release to the customer.
Park has obtained quality and process certifications including:
- ISO 9001:2008
- AS9100
- Nadcap
Low-Volume and Quick Turnaround Tooling
Park’s objective is to use its design, materials and manufacturing expertise to assist its customers in developing the best possible solutions for their aerospace requirements.
Design, Analysis and Build to Print
As a developer and manufacturer of both advanced composite materials and parts, Park has a unique position in the aerospace industry.
Prototyping
Park’s in-depth knowledge of composite materials and their properties enhances Park’s ability to design and manufacture composite structures.